Austin
Rail & Canyon
Power Outage at Barbara Jordan Terminal Restored Faster Than Light Rail
Power was restored at Austin-Bergstrom International Airport by 8:10 p.m. after a 5:18 p.m. outage hit the Barbara Jordan Terminal. The two-hour, 52-minute outage remains faster than Project Connect, now in its sixth year with groundbreaking scheduled for 2027.
