still counting
The exit wound
12.5
years since the Central Subway's drills came out of a hole at Columbus and Powell, its only stop in North Beach
Extension estimate: $440 million to $1.4 billion. Route study began June 2018.
No beach. One line. Since 1911.
Satire, built on real local reporting and typed on a continuous scroll at a cafe table we did not pay rent for. Everyone quoted is made up, the real officials' included; the line at Liguria is not.
No stories found for this location yet.
years since the Central Subway's drills came out of a hole at Columbus and Powell, its only stop in North Beach