Transit Center Charges Rent to Train That Hasn't Arrived
The Transbay Transit Center began charging rent to a Caltrain that won't arrive until 2036. The Portal's cost has ballooned from $2.6 billion to $8.25 billion.
47% vacant, one street saved, and a train box waiting for 2036.
Satire, built on real local reporting and filed during badge season. Everyone quoted is made up, and no real official is quoted.
The Transbay Transit Center began charging rent to a Caltrain that won't arrive until 2036. The Portal's cost has ballooned from $2.6 billion to $8.25 billion.
Sunny one-bedroom, two blocks from the AI Alley corridor. Walk to the Slack-era lobby, the Foundry Square corners and the dog run that is currently a parking lot. Building has a rooftop with a view of a rooftop. Tech-ready. Ask about the sublease.
Bright studio in a boutique building on Mission. Perfect for the commuter who will be commuting in 2036. Transit Center is on the way. Trains not included. Rooftop park access by gondola when operational.
years of an empty rail station under the Transit Center
“I told the Caltrain guy the train box is ready. He said they'd call.”the Salesforce Park gondola line
“Is this the bus or the train? It's the bus. There's always a train on the sign.”the 30 Stockton at Fourth and Townsend
“Every year they say the fair is over at six, and every year my bedroom is still in it at nine.”Folsom Street, last Sunday in September
Which SoMa office building was 97% vacant in 2026, the year its tower was sold in a deed-in-lieu deal?
You say the Flower Mart site will be residential. I have bought flowers at the Flower Mart for thirty years and I can tell you there was never a residential neighbor. The flowers were the neighbor.Ardith Polanco, South Park
Re: the Portal. My grandfather rode the cable car to the Ferry Building in 1948. I am still waiting to be told when I can ride the train in the box under the bus station.Lucius Brennan-Wachtel, Rincon Hill
As a new Rincon Hill resident I would like it on the record that I was not told the Folsom Street Fair was a block party with a fiberglass sculpture in the middle of it. I am awaiting the fair's end time in writing.Deverell Quist-Amador, Rincon Hill
An earlier edition said the Transit Center was finished; it is the bus station, and the train box is still waiting for its train.
The Mission Bay leases referred to in our AI Alley coverage are in Mission Bay, not SoMa, a point we apologize for having to make twice.