Berkeley — UC's 57-year project on the block it bought in 1967 is nearly complete, with the student tower on schedule. The roughly 100 promised supportive and affordable apartments remain about half-funded and will not begin construction until the dorm opens. Demonstrators have moved on to the containers, which are now the park's most visited feature.
The sequence is in the project documents, in order. The 1,113-bed tower opens first. The supportive apartments, roughly 100 units on the same block, begin construction only after students have moved in, according to the timeline the university has described for the site. The housing for the people the park served was scheduled to start after the ribbon is cut. The state of play is that the dorm is funded, and the apartments are about half funded, with a nonprofit developer, SAHA, named in December 2025 to build them.
Moira Tanaka, UC Berkeley's Associate Vice Chancellor for Sequenced Delivery, said the order reflects ordinary construction practice. "You don't want residents moving into an apartment building while there's a dorm going up next to it," Tanaka said. "The dorm has to be finished first. Then the apartments can be disruptive in peace." Asked when the apartments would be occupied, Tanaka said the university had every confidence in the word "subsequent."
The park the dorm replaces has had its own sequence. UC bought the block in 1967. In 1969 the first attempt to build on it ended on Bloody Thursday, and the university has now been trying for 57 years. In January 2024, crews arrived with shipping containers and fenced the grounds. The Supreme Court declined to intervene in the litigation that June, clearing the way. The 2027 opening date comes 58 years after the first fight and roughly three years after the containers.
The containers, meanwhile, have outlasted their purpose. Demonstrators moved on to them after the fence went up, and the wall is now the most visited feature of the site. Dana Whitcomb, a Southside resident who walks past it on her way to the Berkeley Bowl, said she has stopped saying "the park" and started saying "the containers." "People ask me directions to People's Park and I point at the containers," Whitcomb said. "They say thanks and go take a picture. I don't think they know the park is under there."
Chancellor Rich Lyons and UC President James B. Milliken have both backed the project, which counts 148 apartments and 1,113 beds across the site, with about two-thirds of the block kept as open space. An urgent priority listed in the park's own plans is a public restroom. It is slated to arrive with the dorm, in time for the students, and ahead of the apartments.
The supportive apartments, about $60 million in all, are expected to be finished in the fiscal year after they are funded. ■