Poisonal
World
Poisonal
Baches & Banquetas

Javier Mina Avenue Declared Temporarily Closed Until Further Notice, Pending the Other Thirty-One Days

A line of orange traffic cones and a hand-painted sign reading 'closed until water' across a potholed avenue, with a pipa truck parked sideways at the barricade like a gate guard.AI illustration

— The city has counted more than 3,150 potholes across the metropolitan area and reached less than half of them. The Javier Mina crossing, where residents went thirty-two days without water, is the next project in the queue.

The notice, filed under the city's road works program, describes the closure of Avenida Javier Mina as "a rehabilitation project with an indefinite horizon," and lists as its sole completion criterion the restoration of running water to the blocks around the crossing. About twenty residents, who have been standing in the roadway since the outage began, are named in the document as the contractor.

The filing assigns no budget line, because nothing is being built. The blockade, which residents set up to protest 32 days without water, now carries a work order number, a start date and a supervising office. It is the first protest in the metropolitan area to be entered into the paving schedule.

SIAPA said the crossing was chosen because it was already closed. "The street was blocked before we arrived, so we are classifying it as in progress," said Ramiro Ibarra, a coordinator of public works communications who asked that the quote not be read as a defense. "It is the only project this quarter that is ahead of schedule."

The count behind that claim is the city's own. Of more than 3,000 potholes tallied across the metropolitan area, SIAPA reports that fewer than half have been addressed, with its figures showing the Malecón at 98 percent and Díaz de León at 95. Javier Mina does not appear in either column, and the notice explains that the street is being handled "as a closure, not a bache."

Residents on folding chairs beside an official closure barrier in the middle of a Guadalajara avenue at dusk.

Residents occupy the road works program at Javier Mina.

The extension came on the 33rd day. The notice now runs "for the duration of the water shortage," a phrase the engineering office confirmed it chose because it could not enter a date. Asked how long that might be, a clerk at the office pointed to the 33 3818 2222 line, the number residents use for GuaZap, which answers on WhatsApp 24 hours a day and so far has not been asked this question.

A vecina from the neighborhood, who runs a corner stand selling tortillas and asked to be identified only by that, said the arrangement suited some. "At least now someone has written down that we are here," she said. "Before, we were only a number of potholes."

Drivers have been given a detour. It follows the next street over, which has not been counted yet, and the notice advises motorists that the route is "adequate in all conditions except the ones it is in." Residents may use it freely, the notice adds, provided they do not need to bring water.Reopening of the avenue is expected shortly after the water returns. 

But seriously…

The joke above is built on a real story. Here's the straight version.

How many potholes does Guadalajara actually have, and how many has the city fixed?Get the straight answer →

More from Guadalajara

Guadalajara front page
Guadalajara
Centro & Ghosts
Hotel Francés Ghosts Request Pipa Delivery, Cite Four Centuries of Dry Pipes

The hotel's resident spirits requested a water tanker truck delivery. Staff confirmed the 400-year-old building's pipes need repair.

Related: Water rationing and tandeos
Guadalajara
Contingencia
Air Clean in Atemajac, Residents Told to Move There

Atemajac boasts pristine air quality worthy of resort branding. Yet IMECA readings of 7 points tell a different story.

Related: Water rationing and tandeos
Guadalajara
Verde Olivo, Inc.
Army Launches Dating App, Promises 20 Matches by Third Anniversary

After an airline, an airport and a train, the Sedena has launched a dating app with a budget raised 22-fold. Early users report eight matches were cancelled in January for route optimization.

Nearby in Mexico
Guadalajara
El Segundo Piso
Mexico Schedules a Retake of Its Judicial Election for the Voters Who Failed It

The Senate voted 86-41 to move the second judicial election to 2028, after 13% turned out for the first one. Voters who fail the practice ballot may bring a folded study guide, as is tradition.

Nearby in Mexico
Guadalajara
Revisión Anual
Mexico Rates Itself 'Exceeds Expectations' Before Annual Review

Before the fourth T-MEC review round, put off until the US count is done, the Economy Ministry has filed a self-evaluation. It rates 80% tariff-free exports a strength and lists the neighbour under areas for growth.

Nearby in Mexico
Guadalajara
Cifras Oficiales
World Cup Fans Found Staying in Sectur Spreadsheet

World Cup hotels ran 57-65% full, and inspectors have found the missing guests inside Sectur's count of 7.6 million visitors. Housekeeping says they are the tournament's best-behaved fans, and none of them has used a towel.

Nearby in Mexico
GuadalajaraJalisco

Silicon Valley of Mexico. Water on Tuesdays, if the schedule holds.

Guadalajara front page
Satire

The Guadalajara paper is satire from Poisonal News.

Satire, built on real local reporting. Everyone quoted is made up, and no real official is quoted.

It's written with AI from real local reporting. The facts link to their sources; everything else is invented. Every quote is made up, and the pictures are AI illustrations, not photographs.

Something here crosses a line? Report a problem

© 2026 AnyLearn, Inc.