Poisonal
Pass it along a thing worth keeping

University Hills Mixed-Income Housing to Feature Separate Lobbies, Same Rent Division

Developers announced the final design for University Hills' mixed-income housing project: two distinct lobbies, one entrance on the main boulevard and one accessed through the parking garage, will serve residents paying different rates. City planners praised the arrangement as innovative in maintaining community while preserving the socioeconomic integration that federal funding requires.

14 days ago • 8 min read

Developers of the University Hills mixed-income housing project unveiled the final design Tuesday, confirming that residents paying market rate and residents paying the federally required affordable rate will enter the building through separate lobbies. The market-rate entrance faces the main boulevard. The affordable entrance is reached through the parking garage, on a route the project's architect described as "intuitive for those who need it." Asked whether the arrangement complied with the federal funding conditions, a project spokesperson said the building was "fully integrated at the level of the unit." The affordable units share a zip code, a building permit, and a street address with the market-rate units, and nothing else.

UH
University Hills Development Partners
Elevating Community, One Entrance at a Time
:
Residential Operations Team, University Hills Phase One
:
Gerald Thackeray-Obi, Executive Vice President of Resident Experience
:
March 4, 2026
:
Clarifying Amenity Access Following Federal Compliance Review

Team, following our meeting with the City Housing Department, we are issuing updated guidance on how we describe shared spaces to residents and to the press.

{"section":"Terminology Updates","items":"Shared Lobby is now Primary Lobby (Market Entrance).","Affordable Lobby is now Secondary Lobby (Garage Access).","Separate Mailroom is now Distributed Receiving Points.","Segregated Gym is now Tiered Fitness Access."}

We are confident these changes will reduce confusion. Our legal team advises that the word "separate" appears in 14 documents currently under federal review, and that the word "fine" does not appear in any of them.

{"section":"Operational Reminders","items":"Do not describe the garage route as a \"back entrance.\" It is a Secondary Lobby.","Affordable-unit residents should not be informed that the community room is \"on the other side of the building.\" It is on a different side of the building, which is a design feature.","Phase Two finishes for affordable units remain on schedule. Phase Two is the name we are using for the units that have not yet been scheduled."}

Thank you for your continued commitment to the University Hills vision of shared community.

With gratitude,
Gerald Thackeray-Obi, Executive Vice President of Resident Experience
Frequently Asked

Frequently Asked Questions: Phase Two Timeline

Phase Two remains on schedule, according to the project office. The schedule has not been published, and the project office has not confirmed that Phase Two exists as a phase. Residents on the affordable waitlist, currently at 140 households, may submit inquiries to the garage access desk.
Rooftop access is available to residents of the Primary Lobby. Residents of the Secondary Lobby may view the rooftop from the parking garage level, where a window is installed at a height of 4 feet.
The Secondary Lobby is designed to maximize access for residents who arrive by vehicle. Residents who arrive on foot are advised to use the market-rate entrance. Affordable-unit residents who do not own a vehicle will be charged a $200 monthly parking fee to use the garage route.
Yes. Integration is achieved at the level of the unit. Units are assigned by lottery, and a resident of any income bracket may live on any floor. Floors are not assigned to income brackets. They are assigned to floors.
phase 2 stuff
  • call city about mixed-income compliance letter
  • confirm garage route signage says 'secondary lobby'
  • ask legal re: 'separate' vs 'distributed' — which one is in the federal doc
    check the 14 docs
  • waitlist at 140 — do we tell them or just let it sit
  • uptown lease-up was 14 months, bishop arts 14 months. same number again, probably fine
  • community benefit signoff — the two who don't live here, do they need a parking pass
  • rooftop window at garage level, 4 ft — ok?
  • phase 2 countdown clock is installed. nobody mention the clock
  • figure out what 'fully integrated at the level of the unit' means in writing
  • ask marketing
  • ask the lawyer, who said it first
  • move the bench from the affordable side
  • tell gerald about the bench

Residents of the affordable units said they were informed of the Secondary Lobby arrangement by letter. Asked how she felt about the garage route, one waitlisted resident, who has lived on the same block since 1998, said she had not yet decided. Development records show the community benefit agreement was signed by three local representatives, two of whom do not live in the neighborhood. The project office confirmed the agreement was signed. The lobby with the front door faces the boulevard, and the lobby with the garage door faces the back of the garage.

More from Oak Cliff